Intergrate TestComplete test with Microsoft Visual Studio Team system (Test Edition)

The following illustration shows the process through which Testcomplete test results are generated, published, and eventually moved into the operational data stores and data warehouse of Team Foundation Server.

A. Extending Visual Studio Tests with TestComplete Test Projects

1. Create a Test Script in TestComplete6.

2. Create a Test Project in Visual Studio 2008.

3. TestComplete includes a Visual Studio Team System integration package that adds a new test type “TestComplete6 test” to Visual Studio.



4. Add the TestComplete Test suite to the VS Test Project.



In this Visual Studio editor, we can specify the TestComplete project suite with the desired tests and select the specific test items to be executed.

5. Now switch to the Test List Editor panel in VS and select the TestComplete test for execution.



6. After Visual Studio finishes running the tests, we can view the results of the TestComplete test execution directly within Visual Studio,

Comments

0 Responses to "Intergrate TestComplete test with Microsoft Visual Studio Team system (Test Edition)"

Post a Comment